ELSTER A1140 PDF

Camax stock and supply Elster A’s in either 5A Current Transformer Connection or A Direct Connection. This document is intended as a guide to help Suppliers of Elster Metering Systems Your Elster A Meter has been chosen by your Service Provider to . A Three-phase CT Meter available at MWA Technology. Speedy delivery from direct Rating. A, Elster three phase electricity CT meter, 5/10/ A.

Author: Bataur Zulukus
Country: Ukraine
Language: English (Spanish)
Genre: Business
Published (Last): 28 August 2008
Pages: 313
PDF File Size: 14.15 Mb
ePub File Size: 5.62 Mb
ISBN: 157-5-71676-767-2
Downloads: 43403
Price: Free* [*Free Regsitration Required]
Uploader: Yogar

This Scheme may be used to program a number of different meters with the same Tariff and Display sequence. Forum has moved to: For new connections refer to Section 8. The register will then roll over to 0. Open-source tools for energy monitoring and analysis.

External Battery Module power will be removed from the meter if the ‘No button time-out’ programmable from 10 to seconds elter the Power Master Unit has expired.

Note — If this option is used, old readings are stored in the database and new readings are appended.

Because we have a generator set I can’t locate the monitor behind the incoming electricity meter and use it to measure both import and export power, hence have to use our electricity suppliers meter to do that.

Signal strength may be tested by using the monitor on a mobile telephone providing the x1140 uses the same service provider as the SIM in the GSM.

The number of times the cover has been removed to a maximum of 65, is recorded together with the time and date stamps of the last 3 occurrences. You must have JavaScript enabled in your browser to utilize the functionality of this website.

  FLUTTER AURICULAIRE PDF

Page 65 – A2. Rename the scheme and press Enter.

Elster A Bespoke GPRS/GSM/SMS Wireless ASL Modem (UK)

Replace the terminal cover and fit appropriate seals The features available will depend on the meter variant See Section 5. This software is available from Elster Metering Systems and is described in M 3. Switching Times There may be special days in the year when the tariff does not follow the normal pattern, e.

Select Compatibility on the Main Menu Bar. Secure the lower end of the meter to the board using two 5mm dia. A Scheme called New Scheme is entered in the Scheme manager and is highlighted.

Equipment listed is a representative sample only.

ELSTER A1140 Maximum Demand Meter

This overwrites any old data with the new data. I’m in the UK, the generation meter is required as we have to post the readings up every month in order to get paid for the power we generate. This manual is for use with the A meter and the A load profile meter only. You may select a folder already on your system or select a new folder. It’s also convenient for me as I like to dabble with these things: The Elster A is also MID-approved and highly accurate so the user can have complete confidence in all the readings whilst benefitting from the clear, 8-digit, LCD display for local access and data recording.

Both modems are housed in a secure carrier that fits under the meter terminal cover. In A meters the integration period used for the demand registers is the same as the load profile integration period. I’ve given up trying.

Data Stream Mode Double click on the new data to read z1140 the scheme manager Double click one of the readings to view the data read back from the meter. Hi, Yes sorry, I’m in Devon, England: Chapters Table Of Contents Data will be read back from the meter Note: The OBIS code gives a description of the main register displayed.

  ANOMALIA DE EBSTEIN PRENATAL PDF

Elster A1140 Single/Three Phase Smart Meter

The file will contain information required to analyse the failure. Check elstr there is no movement or loose parts within the meter enclosure. Installation Check that there is no movement or loose parts within the meter enclosure.

There are no entries. Page 75 Protection Act I would like to be able to automatically upload live data to pvoutput. RES files to be deleted. The object or folder will appear highlighted. It allows Meter Connection information, Identifiers and Security information to be configured. Alternatively the data can be exported in a file format that is suitable for being transferred into an MV90 system. I can imagine how frustrating it can be when things don’t work as expected.

ELSTER A USER MANUAL Pdf Download.

There’s some good tutorial stuff on the MagPi web site https: Suitable for monitoring both three- z1140 single-phase systems Appropriate for CT and whole current in commercial and light-industrial environments Highly secure and resistant to tampering, power surges, and power cuts. Networking the Power Master Unit Meters – This is a list of meters available on the ekster. I had to use the optical pulse sensor as the system is 3 phase so using CT clamps would have been problematic, but like you I conveniently have a 3 phase smart meter recording all generation.